Colesco Quick Ship Program

Ships in Days,
Not Months.

Colesco's Quick Ship Programs including pressure regulators, control and relief valves, gauges, switches and sanitary pumps, with published lead times from the manufacturers we represent.

Quick Ship products: regulators, relief valves, sanitary pumps and gauges
Jordan Valve Steriflow Valve Kunkle WIKA Q-Pumps

What ships quick.

Four product families cover most urgent maintenance, shutdown and replacement needs. Start with the category, then open the manufacturer program for series, sizes and lead times.

01 / Pressure control

Regulators & control valves

Industrial and sanitary pressure reducing, back pressure and pneumatic control options.

02 / Protection

Relief & check valves

Options for overpressure protection, sanitary relief service and reverse-flow prevention.

03 / Measurement

Gauges & switches

Pressure gauges, electronic switches, quick-test fittings and related instrumentation.

04 / Pumping solutions

Sanitary pumps

Centrifugal, lobular, piston and twin-screw pumps for industrial and sanitary fluid transfer, mixing and process handling.

Featured quick ship programs.

Each program card summarizes the published scope and lead time. Download the program sheet for series, sizes, materials, connections and item numbers. Availability is subject to configuration, quantity and order confirmation.

Jordan Valve 01 / Pressure control

Industrial regulation and control

Pressure reducing, back pressure and pneumatic control globe valves for industrial service.

Published lead time 5 to 15 business days
Download program details
Steriflow Valve 01 / Pressure control

Sanitary regulation and control

Sanitary regulators, compressed air and gas regulators, safety relief and modulating control valves in 316L.

Published lead time 1 to 3 weeks select sizes to 8 weeks
Download program details
Kunkle 02 / Protection

Safety relief valves

Bronze, stainless and cast steel safety and relief valves for liquid, air, gas and steam service.

Published lead time 1 to 4 weeks
Download program details
WIKA 03 / Instrumentation

Industrial instrumentation

Pressure gauges, process gauges, low-pressure gauges, thermometers, transmitters, switches, instrument valves and accessories for industrial, sanitary, utility and OEM applications.

Published lead time 2 to 10 business days stocked configurations
Download program details
Q-Pumps 04 / Pumping solutions

Sanitary pumps

Centrifugal, lobular, circumferential piston and twin screw pumps in stainless steel, from available stock.

Published lead time 2 to 5 days in-stock units
Download program details

Lead times are the manufacturers' published program targets and are not a guarantee. Stock-based programs change as units sell; confirm availability before quoting.

How Quick Ship works.

  1. Pick the program

    Find the category and manufacturer that fits the application, then open the program sheet.

  2. Send the specifics

    Series, size, material, connection, pressure range and quantity. Add the shipping address and preferred method so nothing waits at order.

  3. Colesco confirms and ships

    We verify the configuration against the program, confirm the lead time and place the order with the manufacturer.

Request a quick ship quote.

Tell us what the process needs. A Colesco application specialist will confirm availability and lead time, usually the same business day.

    Request Quote